Pool Repairs Direct builds pools for homeowners. Whether you have plans in hand or are starting to explore a new pool, talk with us about your project and the next steps.


Your new pool.
Eight clear steps.
Here’s how we get your quote, design, selections and approvals in place before construction begins.
- 01
Phone conversation
We discuss the pool you would like, your goals and your property. We collect your address so we can plan the next step.
- 02
At-home layout & design
We visit your home to discuss the site, create a rough pool layout and explore the design with you.
- 03
Design approval & official quote
We prepare the official design for your approval. Once you approve it, we provide an official written quote detailing the full pool dimensions, square footage and material allowances. There are no design fees.
- 04
Execute the contract
Review your official quote and agreed scope, then execute the construction contract.
- 05
Choose your selections
Choose your finishes and materials in the showroom. If you live out of state or cannot visit, we can send you a personal virtual showroom link when it is time, with your selections, available upgrades and upgrade prices.
- 06
Submit for engineering
We submit the approved design for engineered construction plans. Allow approximately 2–4 weeks for engineering.
- 07
Apply for the permit
We apply for the required permit. Permitting can take anywhere from 6 weeks to 6 months. Review and approval timing is controlled by the municipality.
- 08
Schedule the start
We plan to start your job approximately 3–4 weeks after the permit is approved. Your confirmed start date is coordinated with you.
Pool construction photos
See the site work, reinforcing steel and plumbing that go in before the finishes.




Four separate timing windows.
Engineering, permitting, scheduling and construction happen in sequence. The construction estimate begins when work starts, not at your first call.
Municipality-controlled review and approval.
Planned time to start your job.
Once work begins; the 12-week guide is illustrative.
These are separate estimates, not a guaranteed completion date. Design, selections, reviews, site conditions and scheduling can affect the overall timeline. We coordinate your confirmed start date with you.
12 stages of pool construction
Construction generally takes 12–16 weeks once work starts. Weather, inspections, materials and site conditions can change the timing or cause stages to overlap.
Engineering and permitting are not included in this 12-week guide. Permit approval timing is controlled by the municipality. Construction begins after the required approvals and project preparations are complete; your written project schedule controls.
Twelve weeks, twelve distinct construction reference photos. Each image illustrates that week’s work on an independent project; these are not PRD portfolio photographs. Actual scheduling may vary.
Excavation
Lay out and dig the pool footprint.

Steel & main drains
Install the reinforcing steel and main-drain provisions. Complete the required inspection before gunite.

Gunite
Place and shape the concrete pool shell. Follow the specified curing process.

First backfill
Strip temporary forms when ready and backfill to plumbing height.

Perimeter plumbing
Install the pool circulation lines and complete the plumbing inspection before covering.

Final backfill
Backfill to coping height after plumbing approval.

Coping & tile
Install coping and waterline tile. Coordinate grounding/bonding and its inspection before concealment.

Decking
Install the pool deck and coordinate the deck inspection. The homeowner arranges the required safety barrier.

Equipment
Set and plumb the pump, filter and specified equipment.

Electrical
Complete electrical connections, final electrical inspection and the safety-barrier inspection.

Pre-plaster preparation
Clean out the shell and prepare it for the interior finish.

Plaster & fill
Apply the interior finish and begin filling the same day, following crew instructions.

The sequence follows our construction planning guide. Inspection requirements and the approved plans control the work. Filling does not mean the pool is ready for swimming; follow the start-up and handover instructions.
We handle the start-up.
You learn your pool.
After the interior finish and fill, PRD handles the full 30-day fire-up. We then provide Pool School so you understand your equipment, controls and pool care.
We handle the initial 30-day start-up period and guide you through any care instructions that apply to your new pool.
Once the 30-day fire-up is complete, we walk you through operating your pool and equipment, answer your questions and explain ongoing care.
Your questions, answered.
Are there design fees?
No. There are no design fees.
When will I receive my official quote?
After you approve the official pool design. Your written quote lays out the full pool dimensions, square footage and material allowances so you can review the scope before signing the contract.
How much access do you need?
We need at least 6½ feet of access to the work area. We review the available access during the home visit.
Who handles HOA approval?
The homeowner is responsible for obtaining any required HOA approval. Municipality permitting is a separate step.
What if I cannot come to the showroom?
When it is time to choose materials, we can send you a personal virtual showroom link. This is useful for out-of-state customers or anyone unable to visit. It shows your selections, available upgrades and how much each upgrade costs.
How are safety barriers handled?
We discuss safety barriers for each individual project. A typical arrangement uses an existing fence and two in-pool wave alarms. The required arrangement is confirmed for your specific project and its approvals.
Do you handle start-up and teach us how to use the pool?
Yes. PRD handles the full 30-day fire-up and provides Pool School after that period to explain your equipment, controls and ongoing care.
Request your pool
design consultation.
Tell us about the pool you have in mind. Leave your contact details and address to start the conversation. There are no design fees.
(561) 979-4922Need a repair instead?
Explore service calls, leak detection, and renovation estimates.
Palm Beach County.
And the right projects beyond.
Based in Palm Beach County. Projects in Broward, Martin, and St. Lucie counties are considered based on job scope or the number of jobs in the area.
Send the job address and scope so our office can confirm availability.